Built in 1974, the Mars Chocolat France factory (which also houses the head office of the Chocolat France division) has expanded to a surface area of 25,000 m². In 2016, the entire waterproofing of the site's roof was repaired, including a historic part that had never been renovated since its original construction. The construction site had to meet a number of highly technical challenges, in particular the presence of large amounts of roofing equipment and the need for the roof to be able to act as a fireguard.
Thanks to a combination of the load-bearing element, insulation and the BRoof (t3) classified Silver waterproofing coating, we were able to fulfil the technical requirements of the site. The specific reinforcement of the Silver two-layer system and the 20-year guarantee played a determining role in the choice of this solution.
The bitumen Silver bilayer coating system was installed on a thicker layer of insulation (50 mm), followed by 4 cm of gravel to protect the waterproofing and enable a M0 fire classification.
Contact our local team
We can support you to define solutions and services for specific country.
Media Contact
Contact us for more information on BMI Group
group.communications@bmigroup.com